A moisturized surface

03.04.2017

It is also important to maintain concrete dry with a moisturized surface for 3 days. It is also required to make sure that the compression of the update intended for alignment at the locations of sewer pipes under the foundation meets the requirements. Make sure that communications do not pass in the corner places of the base. The use of a sufficient amount of pouring helps to avoid deformations from the shift of the weak zones of the base.

Похожие статьи
Добавить комментарий

Капча загружается...