Also on

14.04.2017

During the construction there is no extra time in order to eliminate the errors of engineering preparation of the site on which construction is underway — it is necessary to create. That is why an unpromitable approach to these things can then be very expensive. And at times this is plunged to accident and even catastrophic consequences during construction. During the engineering preparation of the area, the most characteristic work can be called the following: — clearing and planning of the region, which includes the process of transplanting or protecting green plants, removing the site from unnecessary trees, shrubs, stumps, and if necessary, the liberation of the fertile layer of the soil; — abduction superficial and groundwater; — the transfer of existing and laying the latest engineering networks; — the beginning of the geodesical breakdown base; — a mechanism of permanent and temporary roads; — also on the construction area supply an point for repair and parking of earth and other machines and cars.

Похожие статьи
Добавить комментарий

Капча загружается...