Start repairs in a new building is simple, more important to finish it on time. After that, there is a repair or replacement of windows, doors. At the end of these works, interior partitions, arches and niches are arranged, wiring is done, and, if necessary, distribution boxes, wiring for phone, audio and video, alarm, etc. are being transferred or arranged if necessary. At the same time, the heating, sewage system, water supply, filtering and water heating, and air conditioning are replaced.