Be knitted

11.05.2017

After earthen measures, the drainage layer of sand and gravel should be filled to the bottom of the trench, which must be watered with water and tamp. Then the reinforcement is laid 12 millimeters, while the styling is performed on bricks to protect against corrosion. Next, using the knitting wire, the reinforcement can be knitted. In comparison with the welding process, the reinforcement ligament is more preferable, since metal is weakened in the welding sites.

Похожие статьи
Добавить комментарий

Капча загружается...