But not
22.05.2017
The laying of the first row begins with the bottom of the roof. This is the side that is opposite to the main direction of the wind. So as not to blow out under the edge of the sheet. The lower edge should be so that water from the roof can drain into the center of the cornice gutter, but not more than 70 mm.
Похожие статьи