30.05.2017

When erecting embankments with a height of less than 1 m, as well as when using scrapers or layered slopes, soda patterns are not installed with rollers, and a continuous furrow is carried out along the crossing line of the mole of the Earth with a plow. The slope of the slope is checked as the embankment is erected. With altitude breakdown of the embankment, the possible precipitation of soils should be taken into account.