Each applied
With the lap flooring, there is a basic rule that independently from the material chosen for straightening — it is necessary to give each applied layer the opportunity to dry before proceeding to the next
With the lap flooring, there is a basic rule that independently from the material chosen for straightening — it is necessary to give each applied layer the opportunity to dry before proceeding to the next