Entire surface

29.06.2017

Before covering the floor varnish, you need appropriate preparation — spit, polishing, removal from the floor dust and dirt. Well in the use of a water reduced primer. It is poured on the floor and evenly, quickly distributed over the entire surface with a wide steel spatula. After drying it — this is from forty minutes to an hour, the floor is grinded with a small skin, applying layers of primer.

Похожие статьи
Добавить комментарий

Капча загружается...