Faced with ceramic
04.07.2017
Then we proceed to the plaster of the walls, starting from the bathrooms. Work is carried out on sound, waterproofing, insulation and screed of the floors. Further, the walls and floor are faced with ceramic tiles, suspended ceilings are arranged, partitions are made of drywall, seams are sealed.
Похожие статьи