Faced with ceramic

04.07.2017

Then we proceed to the plaster of the walls, starting from the bathrooms. Work is carried out on sound, waterproofing, insulation and screed of the floors. Further, the walls and floor are faced with ceramic tiles, suspended ceilings are arranged, partitions are made of drywall, seams are sealed.

Похожие статьи
Добавить комментарий

Капча загружается...