In order
17.08.2017
As soon as the camps of the second floor are ready, you will need to build a roof. To do this, you can use several roof options. Also, do not forget that the walls of a private house will definitely need to be additionally insulated in order to maintain heat. After the construction of the box of the second floor, you will have the task of carrying out internal finishing work, which will be associated with the installation of windows, flooring, and worshiping of wallpaper.
Похожие статьи