Lighting are hung

13.09.2017

At the penultimate stage, wall decoration, tile laying and other finishing work is carried out. At the same stage, chandeliers, point lighting are hung, installation of stretch or suspended ceilings is carried out. At the final stage, plumbing and various finishing surfaces are installed, and furniture is also installed.