Of the
A little more complicated and reliable the strip foundation. It is built, having previously prepared a recess in the ground to the depth of freezing. A recess is made along the perimeter of the future building, a substrate of sand and gravel is laid out at the bottom of which is laid out. Then the formwork is made in which the cement mortar is poured. To increase the strength and ability to transfer deformation into the mass of the solution, a metal reinforcing wire is introduced. As a result, an elevation is obtained up to half a meter made of concrete, on which the walls of the house are based. Depending on the characteristics of the terrain and climate, various waterproofing materials are used to prevent water from entering the places of wall compounds and foundation.