The editing
26.12.2017
The last stage is the editing of the tide (from the outside of the window) and the window sill (from the internal), as well as the installation of slopes. This work, as a rule, is paid separately.
Похожие статьи
The last stage is the editing of the tide (from the outside of the window) and the window sill (from the internal), as well as the installation of slopes. This work, as a rule, is paid separately.