The foundation is completed
28.12.2017
In this case, the columns should be located strictly vertically and at the same level. The correct location of the supports is controlled by level and plumb. At the final stage of the pit with supports are poured with concrete. It will take about three or four weeks to completely harden concrete. When the concrete froze, the pits fall asleep with earth. Everything, the creation of the foundation is completed.