Tile, use
If the soil is not durable, tamp it, first wetting it. We make the base for the tile. We connect the stakes with a rope at the required height (do not forget to mark the place of water flow). Next, fall asleep with sand, trample it. We go with a rake and tease to the end with a long bar. Everything is done on stretched ropes — levels. Wet a little on top. Put tiles on a cement-sand mixture, carefully, but pressing strongly to the surface. If you need to move or align the tile, use the mallet. Tiles are laid out in level, following the selected drawing. Upon completion of work, as an additional seal, you can apply a vibration plate. In places of turning or bending, tiles with rounded edges are used. Pour the finished area with sand (without organic matter and salts) and clean it with a hard brush.