Placed drainage pipes

01.11.2017

Sand on the resulting surface, and water with ordinary water for compaction. On top the surface should be closed with strips of geotextiles and placed drainage pipes. Leaf foam must be laid in two layers, and place waterproofing between them.

Похожие статьи
Добавить комментарий

Капча загружается...