So that the

30.11.2017

First you need to determine the place of the future partition, then make sure that pipes or wires do not pass in the already available wall and in the floor. Then the place of creation of the partition is outlined. The profile is fixed on the wall. Next, a rope is pulled, which will serve as a beacon for laying the very first row of blocks. After the installation of the first row, the lace is raised higher so that the second row is also up to be perfectly evenly. The last upper row can be laid with cut blocks if the space there is smaller than the size of the entire blocks.

Похожие статьи
Добавить комментарий

Капча загружается...