And leveling of the

21.04.2017

In the event that it is not linoleum to lay the floor in the kitchen, but another material, preparatory work is required at the first stage. They are that waterproofing and leveling of the floor are ensured. Since the kitchen is likely to appear mold, the base of the inter -story floor should be treated with antiseptic substances.

Похожие статьи
Добавить комментарий

Капча загружается...