In frosty
16.08.2017
In addition, cracks and settlement of the base arise in case of pouring concrete in frozen earth. In frosty and cold periods, it is recommended to pour concrete as quickly as possible, immediately at the end of the robot with the excavator. Otherwise it is required to provide protection against frost.
Похожие статьи