In the
18.08.2017
They receive the following scatter of values: 5% in the manufacture of samples in the laboratory, 10-12% at a construction site with good observance of technology, 15-20% at construction sites with the average quality of work production and 18–20% at construction sites with low quality work production.
Похожие статьи