Necessary to paint
02.10.2017
Now it is necessary to install all the plumbing, doors and door boxes, window sills, insulate window slopes.
After that, final puttying of ceilings and walls for staining or pasting with wallpaper is performed. Then it is necessary to paint the ceilings and walls, stick wallpaper, lay the flooring, install skirting boards, platbands on the door boxes. In conclusion, heating, air conditioning and ventilation devices are installed. Switching switches, sockets, sensors, lamps are arranged.
Похожие статьи