On a design

20.10.2017

The management system must be selected on a design assignment. There should be a vertical gap of at least 25 millimeters between the insulation and the cassettes. When installing, first of all, it is necessary to break the design axes based on the project assignment. Installation should begin with the installation of load -bearing brackets. After the installation of the brackets and their adjustment, the insulation slabs should be installed and attached to the bearing brackets guide profiles. Cassett is installed from the lower row, starting from the center of the facade.

Похожие статьи
Добавить комментарий

Капча загружается...