Put the sand
09.11.2017
At the place of laying the track, we dig a trench with a depth of twenty -five centimeters and width in size of your path. Put the sand in the trench and leveled it with a rake, pour water for compaction with water. Now we begin to lay the chocks in the trench, while breaking them out with a kiyanka. We align all the chocks in level, somewhere more strongly, and somewhere, on the contrary, pouring sand. So we lick the whole path with chocks. Now we drain the soil along the edges of the path and tamp it tightly so that the extreme chocks cannot fall out of the general row. We fall asleep the path with sand, while filling the entire space between the blocks. Excess sand sour cream. Our path is ready.
Похожие статьи