Reliably torn
15.11.2017
At the first stage of construction, you need to make a convenient and best wooden formwork. The walls of the formwork need to be reliably torn by reinforced rods. At the next stage, you should correctly install the box and start the supply of acquired clay, which is usually mixed with straw. Thus, the clay beats and is thoroughly trimmed directly in the box. Clay should withstand at least 2 days. The construction of the structure is carried out using formwork.
Похожие статьи