Roofing material

20.11.2017

Installation of a corner pillar. To do this, it is necessary to drill a pit with a depth of B1 meters to line it with roofing material. A pillar is installed in it and concrete. After the concrete froze, the territory for other pillars is marked. Pull the thread according to the markings and concrete wells. Pillars are painted so that they do not rust. Next, the horizontal jumpers are cut. They are hardly welded between the pillars. When the crate is welded, all welded joints are cleaned and the places where damage to the paint is found. After that they start cutting. It is screwed with roofing screws to the middle of the pillars. Sheathed the fence with a corrugated board, which is fixed with self -tapping screws to the frame.